Prep hours
How much has to come off before anything goes on
The largest line on most exteriors, and the one that separates two bids for the same house. Washing, scraping to a sound edge, feather-sanding the transition, filling, caulking. Sound paint takes a coat. Failing paint takes removal first, and removal is measured in hours.
Linear feet of trim
Trim is counted in length, not in area
Trim, fascia, corner boards, window casings, and door casings are brushed and cut by hand. A house with deep window counts and heavy trim detail costs more to paint than a plain wall of the same size, because the hand work is what the hours go into.
Height and access
How the surface is reached decides the pace
A wall a ladder can stand square against moves quickly. A second-storey gable over a deck, a stairwell ceiling, a run above a sloped bed, or anything that needs staging rather than a ladder moves slowly, and the setup happens before any paint does.
Surface condition
What the existing coat is doing right now
Chalking, mildew, alligatored film, open joints, and bare wood each add their own step. Condition is read surface by surface on the walk, because one elevation can be sound while the one that takes the weather is not.
Substrate
Cedar, fibre cement, stucco, and vinyl are not one job
The substrate sets the prep and the product. Bare wood needs primer the day it is exposed, stucco takes a different film build, and vinyl narrows what may be put on it at all. Naming the substrate is what makes a product line on a scope mean anything.
Colour change
Where the new colour sits against the old one
Colour on colour of similar depth covers differently from light over dark, and a change of colour on trim means every cut line is worked twice rather than once. This is a coverage question, and it is answered per surface.